CHICO ROAD over I-20 @ ML 141.85

5 MI N OF WHITE PLAINS · County 133, Georgia · Built 1971 · 2 Lanes · 80 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013300200
Year Built
1971
Length
84.1 m (275.9 ft)
Max Span
27.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
80
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,078,000
Total Project Cost
$1,618,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.