I-20 WBL over SR 15

1 MI NW OF SILOAM · County 133, Georgia · Built 1968 · 2 Lanes · 142,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013300290
Year Built
1968
Length
57 m (187 ft)
Max Span
19.8 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
142,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$731,000
Total Project Cost
$1,096,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.