TUCKER HOLLOW RD over BLACKWOOD CREEK

4.4 MI SE OF CALHOUN · County 129, Georgia · Built 1996 · 2 Lanes · 970 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000012950800
Year Built
1996
Length
8.5 m (27.9 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
970
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$109,000
Total Project Cost
$164,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.