S CALHOUN BYPASS over MCDANIEL STATION ROAD

4 ML S OF CALHOUN · County 129, Georgia · Built 2020 · 2 Lanes · 8,506 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012951120
Year Built
2020
Length
313.3 m (1027.9 ft)
Max Span
36.6 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
8,506
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$91,316,000
Total Project Cost
$136,974,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.