I-95 NBL over SR 27 (US 25-US 341)

2 MI W JCT SR 27 & SR 303 · County 127, Georgia · Built 1971 · 3 Lanes · 64,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012700550
Year Built
1971
Reconstructed
2009
Length
56.4 m (185 ft)
Max Span
17.7 m
Width
27.8 m (91.2 ft)
Lanes
3
Daily Traffic
64,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$920,000
Total Project Cost
$1,380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.