US 25 US 341 SR over YELLOW BLUFF CREEK

1 MI N SR 303 & SR 27 INT · County 127, Georgia · Built 1973 · 5 Lanes · 22,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000012700230
Year Built
1973
Reconstructed
1985
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
22,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,208,000
Total Project Cost
$1,812,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.