INTERSTATE 285 over NANCY CREEK TRIB

IN S. SANDY SPRINGS · County 121, Georgia · Built 2021 · 1 Lanes · 21,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012154110
Year Built
2021
Length
34.4 m (112.9 ft)
Max Span
34.4 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
21,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,064,000
Total Project Cost
$15,096,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.