MITCHELL STREET over NS RAILROAD

IN SW ATLANTA · County 121, Georgia · Built 2012 · 3 Lanes · 3,510 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012153500
Year Built
2012
Length
168.2 m (551.8 ft)
Max Span
49.4 m
Width
23 m (75.5 ft)
Lanes
3
Daily Traffic
3,510
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,745,000
Total Project Cost
$4,117,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.