TED TURNER DRIVE over ALABAMA ST/CSX RR

DOWNTOWN ATLANTA · County 121, Georgia · Built 1997 · 4 Lanes · 5,770 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012100100
Year Built
1997
Reconstructed
2020
Length
468.2 m (1536.1 ft)
Max Span
65.5 m
Width
18.2 m (59.7 ft)
Lanes
4
Daily Traffic
5,770
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$9,281,000
Total Project Cost
$13,922,000