M.L.K. JR. DRIVE over NS RR-CS 3435 MANGUM

IN ATLANTA · County 121, Georgia · Built 1961 · 5 Lanes · 7,570 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012103910
Year Built
1961
Length
504.7 m (1655.8 ft)
Max Span
62.5 m
Width
22.6 m (74.1 ft)
Lanes
5
Daily Traffic
7,570
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$15,593,000
Total Project Cost
$23,390,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.