SR 70 FULTON INDUS over CAMP CREEK

7.9 MILES N. OF FAIRBURN · County 121, Georgia · Built 2009 · 2 Lanes · 11,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012153330
Year Built
2009
Length
107 m (351 ft)
Max Span
38.1 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
11,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,371,000
Total Project Cost
$2,057,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.