CAMB.-FAIRBURN RD over CHATTAHOOCHEE RIVER

FULTON/DOUGLAS CO LINE · County 121, Georgia · Built 1958 · 2 Lanes · 19,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012100730
Year Built
1958
Length
182.9 m (600.1 ft)
Max Span
30.5 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
19,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,344,000
Total Project Cost
$3,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.