COCHRAN ROAD over CAMP CREEK

8 MI NW OF FAIRBURN · County 121, Georgia · Built 1920 · 2 Lanes · 230 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000012151200
Year Built
1920
Length
25 m (82 ft)
Max Span
12.5 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
230
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$320,000
Total Project Cost
$481,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.