CAMPBELLTON RD over SOUTH UTOY CREEK
IN EAST POINT · County 121, Georgia · Built 1935 · 2 Lanes · 9,430 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.702519, -84.470122
This bridge is in worse condition than 67.7% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 91 years old.
Nearby Bridges
SR 154 over SOUTH UTOY CREEK
Built 1964
DODSON DRIVE over SR 154 LAKEWOOD FWAY
Built 1965
DODSON DRIVE over SOUTH UTOY CREEK
Built 1929
DELOWE DRIVE over SOUTH UTOY CREEK TRIB
Built 1970
SR 154 SBL over M-9071 DELOWE DRIVE
Built 1965
SR 154 / SR 166 NB over M-9071 DELOWE DRIVE
Built 1965
MAXWELL DRIVE over SR 154
Built 1965
ALISON STREET over SOUTH UTOY CREEK TRIB
Built 1966
SR 154 SBL over M-9072 STANTON ROAD
Built 1965
SR 154 NBL over M-9072 STANTON ROAD
Built 1965
Bridge Details
- Structure #
- 000000012103540
- Year Built
- 1935
- Reconstructed
- 1945
- Length
- 17.7 m (58.1 ft)
- Max Span
- 17.7 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 9,430
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $227,000
- Total Project Cost
- $340,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.