EBENEZER CH RD over PELHAM CREEK

2.5 MI E OF PEACHTREE CTY · County 113, Georgia · Built 1965 · 2 Lanes · 3,210 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000011350250
Year Built
1965
Length
24.7 m (81 ft)
Max Span
8.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
3,210
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$316,000
Total Project Cost
$475,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.