SPEAR ROAD over CAMP CREEK

2.4 MI EAST OF PEACHTREE · County 113, Georgia · Built 2016 · 2 Lanes · 5,369 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000011350700
Year Built
2016
Length
11.9 m (39 ft)
Max Span
1.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
5,369
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,478,000
Total Project Cost
$5,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.