PTREE PARKWAY EXT over CAMP CREEK

AT PEACHTREE CITY LIMITS · County 113, Georgia · Built 1998 · 2 Lanes · 11,256 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000011350600
Year Built
1998
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
11,256
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.