ALBANY-NORTHWEST SECTION · County 095, Georgia · Built 2024 · 2 Lanes · 9,530 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
31.621667, -84.218056
This bridge is in worse condition than 20% of bridges in County 095. The average bridge in Georgia is 0 years old; this one is 2 years old.
Nearby Bridges
US 82/SR 520 (EBL) over N WESTOVER BLVD
Built 2024
SR 520/US 82 over M-0136
Built 1999
NOTTINGHAM WAY ST over SR 520 ( US 82 COR Z)
Built 1980
US 82/SR 520 (EBL) over M-149 PALMYRA ROAD
Built 1979
US 82/SR 520 (WBL) over M-149 PALMYRA ROAD
Built 1979
US 82/SR 520 (EBL) over CSX RAILROAD (ABANDONED)
Built 1980
US 82 /SR 520(WBL) over CSX RAILROAD (ABANDONED)
Built 1980
PALMYRA ROAD over FOWLTOWN CREEK
Built 1955
US 19 SR 3 over KINCHAFOONEE CREEK
Built 1949
US 82 /SR 520(EBL) over SR 520B (US 19B-US 82B)
Built 1974
Bridge Details
- Structure #
- 000000009550240
- Year Built
- 2024
- Length
- 38.4 m (126 ft)
- Max Span
- 38.4 m
- Width
- 12 m (39.4 ft)
- Lanes
- 2
- Daily Traffic
- 9,530
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,174,000
- Total Project Cost
- $16,761,000