NOTTINGHAM WAY ST over SR 520 ( US 82 COR Z)
ALBANY - NORTH WEST SECTI · County 095, Georgia · Built 1980 · 4 Lanes · 17,300 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.617522, -84.204208
This bridge is in worse condition than 20% of bridges in County 095. The average bridge in Georgia is 0 years old; this one is 46 years old.
Nearby Bridges
US 82/SR 520 (WBL) over N WESTOVER BLVD
Built 2024
US 82/SR 520 (EBL) over N WESTOVER BLVD
Built 2024
US 82/SR 520 (EBL) over M-149 PALMYRA ROAD
Built 1979
US 82/SR 520 (WBL) over M-149 PALMYRA ROAD
Built 1979
US 82/SR 520 (EBL) over CSX RAILROAD (ABANDONED)
Built 1980
US 82 /SR 520(WBL) over CSX RAILROAD (ABANDONED)
Built 1980
SR 520/US 82 over M-0136
Built 1999
US 82 /SR 520(EBL) over SR 520B (US 19B-US 82B)
Built 1974
US 82 /SR 520(WBL) over SR 520B (US 19B-US 82B)
Built 1974
10TH AVENUE over KINCHAFOONEE CREEK TRIB
Built 1969
Bridge Details
- Structure #
- 000000009500530
- Year Built
- 1980
- Length
- 87.2 m (286.1 ft)
- Max Span
- 33.5 m
- Width
- 20.8 m (68.2 ft)
- Lanes
- 4
- Daily Traffic
- 17,300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,727,000
- Total Project Cost
- $2,590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.