US 82/SR 520 (EBL) over M-149 PALMYRA ROAD

ALBANY - NORTHSIDE · County 095, Georgia · Built 1979 · 2 Lanes · 9,530 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009500040
Year Built
1979
Length
67.7 m (222.1 ft)
Max Span
30.5 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
9,530
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$867,000
Total Project Cost
$1,301,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.