NORTHCREST ROAD over I85- 3 I85 RMP- 2 I285 R

1.7 MI E OF DORAVILLE · County 089, Georgia · Built 1985 · 6 Lanes · 11,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000008902090
Year Built
1985
Length
127.4 m (418 ft)
Max Span
55.8 m
Width
29.4 m (96.5 ft)
Lanes
6
Daily Traffic
11,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,415,000
Total Project Cost
$5,122,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.