PRIMROSE BRIDGE RO over SWIFT CREEK

6.8 MI W OF ARABI · County 081, Georgia · Built 2016 · 2 Lanes · 110 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008150600
Year Built
2016
Length
48.8 m (160.1 ft)
Max Span
6.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
110
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$14,208,000
Total Project Cost
$21,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.