PATEVILLE ROAD over N BRANCH SWIFT CREEK

3.5 MI W OF ARABI · County 081, Georgia · Built 1989 · 2 Lanes · 70 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000008150010
Year Built
1989
Length
11.9 m (39 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
70
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$152,000
Total Project Cost
$229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.