I-85 over SR 14 (US 27 ALT.)

3.7 MI S OF NEWNAN · County 077, Georgia · Built 1969 · 6 Lanes · 69,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000007700400
Year Built
1969
Length
82.9 m (272 ft)
Max Span
21.3 m
Width
42.4 m (139.1 ft)
Lanes
6
Daily Traffic
69,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,222,000
Total Project Cost
$3,333,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.