SE NEWNAN BYPASS over NOR/SOU. RAILROAD

2.5 MI E OF NEWNAN · County 077, Georgia · Built 2016 · 2 Lanes · 11,256 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000007751740
Year Built
2016
Length
36.9 m (121.1 ft)
Max Span
36.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
11,256
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$10,730,000
Total Project Cost
$16,095,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.