SE NEWNAN BYPASS over NOR/SOU. RAILROAD

2.5 MI E OF NEWNAN · County 077, Georgia · Built 2016 · 2 Lanes · 4,547 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000007751730
Year Built
2016
Length
36.3 m (119.1 ft)
Max Span
36.3 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
4,547
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$10,582,000
Total Project Cost
$15,873,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.