I-75/I-285/RAMP-A over I-285/S.COBB/RAMPAA

6.7 MILES SOUTH EAST OF M · County 067, Georgia · Built 2017 · 1 Lanes · 6,805 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000006753350
Year Built
2017
Length
286.8 m (940.9 ft)
Max Span
61 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
6,805
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$83,561,000
Total Project Cost
$125,341,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.