R 7-2SB/ML-I285WBR over I-285WB/COBB PKY WY RAMP
6.7 MILES SOUTH EAST OF M · County 067, Georgia · Built 2017 · 1 Lanes · 6,805 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.889514, -84.463936
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 9 years old.
Nearby Bridges
I-75/I-285/RAMP-A over I-285/S.COBB/RAMPAA
Built 2017
I-75 R TO I-285 WB over I-285 CD WEST BOUND
Built 1986
I-285 over RMP I-285 CCBL TO I-75S
Built 1978
I-75R FROM WINDY H over I-75 RAMP TO I-285
Built 1985
I-75 RAMP TO I-285 over I-285- I-75- 3 RAMPS
Built 1986
I-285 RMP CCBL- CD over I-75
Built 2017
I-285 over I-75
Built 1978
RAMP I-285W TO I-7 over I-285 CBL CD
Built 1963
I-285 RMP CCBL- CD over I-285 RAMP TO I-75 NBL
Built 1963
I-285 over RAMP I-285C TO I-75 NBL
Built 1978
Bridge Details
- Structure #
- 000000006753340
- Year Built
- 2017
- Length
- 165.8 m (544 ft)
- Max Span
- 48.8 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 1
- Daily Traffic
- 6,805
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $38,362,000
- Total Project Cost
- $57,543,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.