I-285 over SR 3 (US 41)

3.1 MI EAST OF SMYRNA · County 067, Georgia · Built 1963 · 8 Lanes · 187,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006700990
Year Built
1963
Reconstructed
1986
Length
73.2 m (240.2 ft)
Max Span
24.7 m
Width
45.5 m (149.3 ft)
Lanes
8
Daily Traffic
187,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,472,000
Total Project Cost
$3,708,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.