US19 SR3 CONN. over I-75 (NBL & SBL)

JCT I-75 US 19 · County 063, Georgia · Built 1996 · 2 Lanes · 60,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006350420
Year Built
1996
Length
158.5 m (520 ft)
Max Span
79.2 m
Width
15.7 m (51.5 ft)
Lanes
2
Daily Traffic
60,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.