I-75 over CR 332 HOLIDAY BOULEVARD

0.75 MI W OF MORROW · County 063, Georgia · Built 1965 · 8 Lanes · 174,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006300370
Year Built
1965
Reconstructed
1991
Length
38.7 m (127 ft)
Max Span
15.8 m
Width
41.2 m (135.2 ft)
Lanes
8
Daily Traffic
174,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.