US 19 / SR 3 over I-75

2.5 MI W OF MORROW · County 063, Georgia · Built 1965 · 6 Lanes · 20,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006300030
Year Built
1965
Reconstructed
1988
Length
94.8 m (311 ft)
Max Span
24.4 m
Width
27.6 m (90.6 ft)
Lanes
6
Daily Traffic
20,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.