COLLEGE STATION RD over NORTH OCONEE RIVER

2 MI S OF ATHENS SQ · County 059, Georgia · Built 2015 · 4 Lanes · 3,695 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005950420
Year Built
2015
Length
82.3 m (270 ft)
Max Span
28 m
Width
24.8 m (81.4 ft)
Lanes
4
Daily Traffic
3,695
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$23,976,000
Total Project Cost
$35,964,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.