SR8 SR10L US29 (CB over SR 10 (US 78 BUS)

1.3 MI S OF ATHENS SQ · County 059, Georgia · Built 1976 · 2 Lanes · 23,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005900430
Year Built
1976
Length
57 m (187 ft)
Max Span
19.2 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
23,350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.