SR 92 (SBL) over CLARK CREEK

7.8 MI. WEST OF WOODSTOCK · County 057, Georgia · Built 2008 · 2 Lanes · 23,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005750940
Year Built
2008
Length
348.7 m (1144 ft)
Max Span
31.7 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
23,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,470,000
Total Project Cost
$6,705,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.