SR 92 over I-75

7.8 MI W OF WOODSTOCK · County 057, Georgia · Built 1976 · 8 Lanes · 30,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005700150
Year Built
1976
Reconstructed
2008
Length
98.8 m (324.1 ft)
Max Span
32 m
Width
36.8 m (120.7 ft)
Lanes
8
Daily Traffic
30,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,337,000
Total Project Cost
$5,006,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.