GOLD BRIDGE CROSSI over DOWNING CREEK

3.0 MI W OF HOLLY SPRINGS · County 057, Georgia · Built 2001 · 2 Lanes · 2,750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005750880
Year Built
2001
Length
18.6 m (61 ft)
Max Span
18.6 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
2,750
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$238,000
Total Project Cost
$358,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.