S-2556 (OLD SR 5) over SR 417 (I-575)

@ N HOLLY SPRINGS CL. · County 057, Georgia · Built 1982 · 5 Lanes · 18,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005700040
Year Built
1982
Length
106.4 m (349.1 ft)
Max Span
56.1 m
Width
27.2 m (89.2 ft)
Lanes
5
Daily Traffic
18,100
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,479,000
Total Project Cost
$3,719,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.