HOLLY STREET over SR 417 (I-575)

AT W HOLLY SPRINGS CL · County 057, Georgia · Built 1982 · 2 Lanes · 5,369 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005700390
Year Built
1982
Length
105.2 m (345.1 ft)
Max Span
59.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
5,369
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,348,000
Total Project Cost
$2,022,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.