AIRPORT ROAD over SR 417 (I-575)

5.8 MI NE OF CANTON · County 057, Georgia · Built 1984 · 2 Lanes · 1,594 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005700820
Year Built
1984
Length
91.1 m (298.9 ft)
Max Span
26.8 m
Width
18.7 m (61.4 ft)
Lanes
2
Daily Traffic
1,594
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,168,000
Total Project Cost
$1,752,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.