E. CHEROKEE DRIVE over ETOWAH RIVER

2.9 MI S OF BALL GROUND · County 057, Georgia · Built 1966 · 2 Lanes · 6,870 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005700690
Year Built
1966
Length
94.8 m (311 ft)
Max Span
27.7 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
6,870
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,215,000
Total Project Cost
$1,823,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.