CANTON HIGHWAY over SHARP MOUNTAIN CREEK

2.5 MI SW OF BALL GROUND · County 057, Georgia · Built 1936 · 2 Lanes · 11,256 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005700090
Year Built
1936
Reconstructed
1954
Length
50 m (164 ft)
Max Span
13.4 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
11,256
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$641,000
Total Project Cost
$961,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.