SR 92 over NOONDAY CREEK

IN SW WOODSTOCK · County 057, Georgia · Built 1962 · 7 Lanes · 49,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005700180
Year Built
1962
Reconstructed
2000
Length
48.8 m (160.1 ft)
Max Span
9.8 m
Width
33.3 m (109.3 ft)
Lanes
7
Daily Traffic
49,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,478,000
Total Project Cost
$2,216,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.