SR 92 over SR 417 (I-575)

1.5 MI SW OF WOODSTOCK · County 057, Georgia · Built 1980 · 10 Lanes · 39,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005700170
Year Built
1980
Reconstructed
2000
Length
96.3 m (315.9 ft)
Max Span
50.3 m
Width
43.6 m (143 ft)
Lanes
10
Daily Traffic
39,300
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,929,000
Total Project Cost
$5,893,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.