I-575 MANAGED LANE over TOWNE LAKE PARKWAY

0.7 MI W OF WOODSTOCK · County 057, Georgia · Built 2016 · 1 Lanes · 970 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005751070
Year Built
2016
Length
57.6 m (189 ft)
Max Span
26.8 m
Width
9.5 m (31.2 ft)
Lanes
1
Daily Traffic
970
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,798,000
Total Project Cost
$25,197,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.