RAGLAND ROAD over CHATTOOGA RIVER TRIB

2 MI SW OF LYERLY · County 055, Georgia · Built 1952 · 2 Lanes · 80 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005550220
Year Built
1952
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
5.2 m (17.1 ft)
Lanes
2
Daily Traffic
80
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$98,000
Total Project Cost
$147,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.