TALIAFERO SPGS RD over CHATTOOGA RIVER

1 MI S OF LYERLY · County 055, Georgia · Built 2019 · 2 Lanes · 60 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005550980
Year Built
2019
Length
146.3 m (480 ft)
Max Span
24.4 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
60
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$42,624,000
Total Project Cost
$63,936,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.