OAK HILL ROAD over BROOMTOWN CREEK

3 MI NW OF LYERLY · County 055, Georgia · Built 1945 · 2 Lanes · 360 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005500240
Year Built
1945
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
360
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$117,000
Total Project Cost
$176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.