HOULIHAN BRIDGE over SAVANNAH RIVER

1 MI NE PORT WENTWORTH · County 051, Georgia · Built 2024 · 2 Lanes · 5,140 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000005151340
Year Built
2024
Length
807.7 m (2649.9 ft)
Max Span
51.8 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
5,140
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$235,320,000
Total Project Cost
$352,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.