JIMMY DELOACH PKWY over SR-30 (BONNY BRIDGE ROAD

PORT WENTWORTH CITY LIMIT · County 051, Georgia · Built 2015 · 4 Lanes · 15,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005151000
Year Built
2015
Length
29.6 m (97.1 ft)
Max Span
29.6 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
15,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,584,000
Total Project Cost
$12,876,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.